The Kempegowda International Airport has commenced operations on the new South Runway with the landing of the first flight on the 4,000-metres long and 45-metres wide airstrip. The South Runway will begin with limited landings and take offs before gradually scaling up flight operations. This makes the BLR Airport the first in the country to operate independent parallel runways, enabling aircraft to land or take-off simultaneously on both runways.